Full restoration consists of two major phases. The first, mitigation, consists of demolition, cleaning and drying out the structure and belongings. This phase usually takes 3 – 4 days. The second phase, repairs, can range from a few days to several weeks depending on the degree of damage and lead time of materials such as drywall